Architect Moniga del Garda: this page collects the public data available for owners and foreign buyers considering a villa project in Moniga del Garda (BS): OMI villa values, the area, planning rules and landscape constraints, and the checks to make before buying a plot. Every figure is sourced; the studio’s assessments are labelled as such and where a figure is not available we say so. Federico Cappellina Architects is based in Verona.
Studio projects
Some projects by the studio: each card leads to the project page, with photos and description. The full list is on the Projects page.

AV Home — Dueville (Vicenza)
Contemporary villa of about 300 m² in Dueville (Vicenza), with an infinity pool, interiors and a private spa. See the project →

Villa MD Home — Verona
Villa in Verona, 280 m²: white volumes, a black wall, floor-to-ceiling glazing and a pool. See the project →

All studio projects
Villas, interiors and multi-residential projects by the studio: the full list is on the Projects page. See all projects →
Talk to the studio: architect Moniga del Garda
For information on a plot, a property or a villa project: write to the studio, the answer comes in writing.
or write to info@federicocappellina.com

Architect Moniga del Garda: villa market in Moniga del Garda: OMI data
The reference for residential values is the OMI database published by the Agenzia delle Entrate (the Italian revenue agency), second semester 2025, as reported by recasa.re.
- Ville e villini, medio: 2,750 €/sqm, with a maximum of 3,000 €/sqm for the zone.
- All dwellings, average: 1,697 €/sqm.
- Residential transactions 2024 (NTN): 64.4, of which 15 concerned properties over 145 sqm.
Two points of interpretation. First, OMI values are expressed per square metre and refer to ordinary market conditions; they are not a valuation of a specific property. Second, the gap between the villa figure and the all-dwellings average indicates that the detached and semi-detached segment sits at a distinct level from apartments and smaller units.
The share of transactions above 145 sqm (15 out of 64.4) is a useful indicator of how thin the large-property segment is: this is the studio’s assessment, and it means that comparable evidence for a specific villa may be limited. A property-specific valuation and a check of the actual condition, orientation and access of a building remain necessary before any figure is used in a negotiation.
Architect Moniga del Garda: the area of Moniga del Garda
Moniga del Garda is a municipality in the province of Brescia, Lombardy, on the shore of Lake Garda. The municipal boundaries indicated by the available source are with Manerba del Garda, Padenghe sul Garda and Soiano del Lago (source, non-institutional).
- Altitude: 125 m above sea level, given as the altitude of the municipal building (Casa comunale) by the available source; whether this corresponds to the altitude of the built-up centre in the sense required is not known and must be checked. Source: tuttitalia.it.
- Resident population: a verified ISTAT figure cannot be given. Available results report values and dates that do not agree and do not cite a direct ISTAT source. The available, non-official figure is an estimate at 1 January 2026 from tuttitalia.it; the figure must be checked with the municipality or against ISTAT directly.
- Road distances to regional capitals or airports: not known. Available sources report airport distances without clarifying the road route or the point of departure with sufficient precision.
- Seismic and climate classification: seismic zone 2; climate zone E, 2,229 degree-days (source, non-institutional).
- Protected areas or Natura 2000 sites within the municipal territory: not known; available results do not identify a reliable source specifying which areas fall within the municipality.
For the project, the seismic classification is not a formality: zone 2 means that structural design and verification follow the national seismic code, and this affects both new construction and interventions on existing buildings. This is the studio’s assessment of the consequence, not a statement of the code’s content. The climate classification (zone E, 2,229 degree-days) is the parameter used for heating-system design and for the energy performance framework; it should be confirmed against the current regional and national rules at the time of design.
Architect Moniga del Garda: planning and landscape constraints in Moniga del Garda
The municipality has a Piano di Governo del Territorio (PGT), the municipal land-use plan introduced in Lombardy. The municipal notice on the third variant states that the original PGT was approved on 29 December 2011; the second variant was approved on 15 April 2021 and published in the BURL (the official bulletin of the Lombardy region) on 20 July 2022.
The notice also documents the start of a third variant but does not attest its approval: on the available sources, the PGT with the second variant is the last approved version that can be verified (municipal notice and dates). A dedicated municipal page with links to the PGT documents in force is not known and must be requested from the municipality.
On landscape constraints under the Codice dei beni culturali e del paesaggio (D.Lgs. 42/2004):
- Article 142, lake belt: the law provides a 300-metre belt from the shoreline of lakes (art. 142, paragraph 1, letter b). Which parcels in the municipality fall within that belt cannot be verified from a reliable cartographic source: not known. Official text.
- Article 142, woods and mountain territories: the law includes land covered by woods (letter g) and, under the conditions set out, mountain territories above the stated altitude thresholds (letter d). There is no reliable cartographic source confirming the presence and extent of these constraints in the municipal territory: not known. Official text.
- Article 136, areas of notable public interest: no verifiable institutional measure identifying perimeters that may affect Moniga del Garda is available: not known. The article defines the categories of property and areas that may be declared of notable public interest. Official text.
- Limits on new construction or special municipal rules: not known. The notice on the variant confirms the existence of the PGT and its variants but does not contain rules sufficient to describe specific building limits; the current maps and technical implementing rules (norme tecniche di attuazione) are required. Municipal notice.
For the project, the practical consequence is that the constraint status of a specific plot cannot be assumed from the municipality’s lakeside position alone. This is the studio’s assessment: the first step for any acquisition or renovation is a parcel-level check of the PGT maps, the landscape constraint mapping and the technical implementing rules, carried out with the municipality before design work begins. The checks listed above as “not known” are the ones to be resolved in that phase.
Architect Moniga del Garda: what this means for designing a villa in Moniga del Garda
The facts above have direct consequences for a project. The points below are the studio’s assessments, not regulatory statements; each one rests on a fact that is cited or on a gap that is declared.
- Planning status. The municipality has a Piano di Governo del Territorio (PGT). The municipal notice records that the original PGT was approved on 29 December 2011, that the second variant was approved on 15 April 2021 and published in the BURL on 20 July 2022, and that a third variant has been started but not, on the available evidence, approved (municipal notice). Assessment: a project must be designed against the approved second variant and its technical implementing rules, while keeping in mind that a third variant in progress may change the framework during the life of the project. A dedicated municipal page listing the PGT documents in force cannot be confirmed: this must be checked with the municipality.
- Lake buffer. The 300-metre band from the shoreline under art. 142, comma 1, letter b, of D.Lgs. 42/2004 (official text) is a landscape constraint. Which parcels in Moniga fall inside it cannot be verified from an authoritative map here: this must be checked with the municipality. Assessment: for any plot near the lake, the position relative to the band should be established before design work begins, because it affects the authorisation route rather than the layout alone.
- Woods and mountain territories. The same article covers land covered by woods (letter g) and, under the conditions set out in the law, mountain territories above the stated altitude thresholds (letter d). Presence and extent in the municipal territory cannot be confirmed from a reliable map: this must be checked. Assessment: on plots with tree cover, a survey of existing vegetation should precede any layout decision.
- Heritage designations. No verifiable institutional act identifying perimeters under art. 136 has been found for Moniga del Garda: this must be checked with the municipality. Assessment: the point should be resolved at due-diligence stage, since a designation changes what can be altered on an existing building.
- Seismic and climate. The municipality is in seismic zone 2 and climate zone E, with 2,229 degree-days (source, non-institutional). Assessment: zone 2 requires structural design and deposit of the structural calculation under the seismic rules; climate zone E with 2,229 degree-days sets the frame for thermal performance and heating design. Both are design inputs, not obstacles.
- Market context. With OMI at 2,750 €/sqm for ville e villini (maximum 3,000) and 15 transactions above 145 sqm in 2024 (recasa.re), assessment: the design brief and the budget should be set against a thin comparable base, and construction cost should be estimated separately from property value.

Architect Moniga del Garda: checks before buying a plot in Moniga del Garda
The following sequence is specific to this municipality. Items marked as unknown above cannot be answered from the sources used for this page and require a municipal or notarial check.
- Zoning of the parcel. Obtain the PGT maps and the technical implementing rules (norme tecniche di attuazione) in force, and confirm the destination of the specific parcel. The municipal notice confirms the PGT exists but does not contain rules sufficient to describe building limits (notice).
- Status of the third PGT variant. Ask the municipality whether the third variant has been adopted or approved since the notice, and whether it affects the parcel.
- Lake band under art. 142. Request confirmation of whether the parcel lies within 300 metres of the shoreline and what authorisation this entails (D.Lgs. 42/2004).
- Woods and mountain-territory constraints. Confirm whether the parcel is affected under letters g or d of the same article; the position here is unknown and must be checked.
- Art. 136 designations. Confirm with the municipality whether any perimeter under art. 136 affects the parcel or nearby buildings; no verifiable act has been identified.
- Protected areas and Natura 2000. Confirm whether any protected area or Natura 2000 site falls within the municipal territory and touches the parcel; this cannot be stated from the sources used.
- Seismic and energy classification. Record zone 2 and climate zone E with 2,229 degree-days in the brief, and obtain the structural and energy parameters applicable to the plot (source, non-institutional).
- Access and distances. Road distances to capitals and airports cannot be stated from reliable sources: measure them on site rather than relying on published figures.
- Title and cadastral position. Verify ownership, boundaries with Manerba del Garda, Padenghe sul Garda and Soiano del Lago, and any easements through a notary (boundary source, non-institutional).
- Market evidence. Collect transaction evidence for comparable villas, given the limited number of large-property sales recorded in 2024 (OMI data).

How the studio works
The method is organised in stages. Each stage ends with a defined output, and the next stage starts only when that output is agreed.
- Brief and feasibility. Site data, planning status and the client’s requirements are set out in writing; constraints are identified before any drawing is produced.
- Due diligence support. The studio coordinates the checks listed above with the municipality, notary and technical consultants, and reports the results in a single document.
- Concept design. Layout, orientation, volumes and relationship with the site are developed into a proposal that respects the constraints confirmed in the previous stages.
- Technical and permit stage. The project is developed to the level required for the planning application and for the structural and energy submissions.
- Construction stage. Drawings, specifications and site supervision are managed through to completion.
Communication with foreign clients is in English, with documents issued in Italian for filing with the authorities.
Do you need an architect Moniga del Garda for your plot?
Before buying, the studio reads the planning instrument, constraints and indices of the plot with you. Send the location, cadastral references or the listing.
or write to info@federicocappellina.com

Frequently asked questions
When should you involve an architect Moniga del Garda before buying a plot?
Before signing the preliminary contract. An architect Moniga del Garda reads the planning instrument, the constraints map and the technical rules that apply to the plot, and lists the checks to request from the municipality and the notary: this is the stage where a mistake costs least.
What does an architect Moniga del Garda do besides the design?
An architect Moniga del Garda follows the building and landscape permit, coordinates the consultants (structures, services, geologist) and supervises the works. The stages are described in the section «How the studio works».
How to choose an architect Moniga del Garda for a villa?
Look at completed projects, knowledge of local planning instruments and the ability to follow the site. The studio’s projects are on the Projects page.
How much does an architect Moniga del Garda cost for a villa?
An architect Moniga del Garda’s fee depends on the size of the work, the plot’s constraints and the stages requested (design, permit application, construction drawings, site supervision): it is set in a written quotation after the plot has been analysed.
What should you ask an architect Moniga del Garda to put in writing before the appointment?
The scope with the stages included, the fee for each, the estimated timing and the list of consultants involved. An architect Moniga del Garda should also state which checks remain with the client.
Can an architect Moniga del Garda handle the landscape permit too?
Yes: where the area is subject to a landscape constraint the architect prepares the documentation for the landscape authorisation together with the design; timing depends on the authorities concerned.
How long does an architect Moniga del Garda need to design a villa?
It depends on complexity and approval times: the design develops in stages and permit timing must be checked with the municipality before a schedule is fixed.
Can you involve an architect Moniga del Garda before buying the plot?
It is the prudent choice: the architect checks indices, constraints and access on the plot before the purchase, so conditions can be discussed with the seller while the decision is still open.
Do you need an architect Moniga del Garda for a renovation?
If the work needs a building permit or touches a landscape-protected area, an architect Moniga del Garda checks which procedure applies with the municipal technical office before any commitment.
What can an architect Moniga del Garda tell you before an offer on a plot?
An architect Moniga del Garda can read the planning instrument and the constraints map for the plot and list what must still be verified, so that the offer reflects what can actually be built.
Can I build a new villa on any plot in Moniga del Garda?
No general answer can be given. Building limits depend on the PGT in force and its technical rules, which must be read for the specific parcel; the municipal notice does not contain rules sufficient to describe them. This must be checked with the municipality.
Is the PGT currently in force the second variant?
On the available evidence, yes: the second variant was approved on 15 April 2021 and published in the BURL on 20 July 2022. A third variant has been started; whether it has since been approved must be checked with the municipality (notice).
Does the 300-metre lake band apply to my plot?
The band exists under art. 142, comma 1, letter b, of D.Lgs. 42/2004, but which parcels fall inside it in Moniga cannot be verified from the sources used. This must be checked with the municipality.
Are there woods or mountain-territory constraints on the land?
The law covers woods and, under conditions, mountain territories above given altitudes. Presence and extent in the municipal territory cannot be confirmed here. This must be checked.
What do the OMI figures mean for my budget?
They are per-square-metre market references, not a valuation: 2,750 €/sqm for ville e villini, maximum 3,000, against 1,697 €/sqm for all dwellings (recasa.re). A property-specific valuation and a separate construction-cost estimate are needed.
What seismic and climate requirements apply?
The municipality is in seismic zone 2 and climate zone E with 2,229 degree-days (source, non-institutional). These set the frame for structural design and thermal performance.
How far is Moniga del Garda from airports or provincial capitals?
Road distances cannot be stated from reliable sources: the available figures do not specify the route or starting point with sufficient precision. They should be measured directly.
For a specific plot or building in Moniga del Garda, the studio can review the facts above against the documents you hold and set out which checks remain open. Contact the studio; selected work is published at federicocappellina.com/projects.
Architect Moniga del Garda: notes for those weighing an appointment
- An architect Moniga del Garda checks the planning designation of the plot before any volume is hypothesised.
- An architect Moniga del Garda asks the municipality for the certification of the constraints that affect the area.
- An architect Moniga del Garda compares the design with the building indices and the distances from boundaries and roads.
- An architect Moniga del Garda coordinates geologist, structural engineer and services engineers from the concept stage.
Architect Moniga del Garda: ask the studio for information
For a villa project or a plot consultation: tell us the municipality, the area and your starting ideas. Direct contact with the architect, in writing.
or write to info@federicocappellina.com