Architect Brenzone sul Garda: this page collects the public data available for owners and foreign buyers considering a villa project in Brenzone sul Garda (VR): OMI villa values, the area, planning rules and landscape constraints, and the checks to make before buying a plot. Every figure is sourced; the studio’s assessments are labelled as such and where a figure is not available we say so. Federico Cappellina Architects is based in Verona.
Studio projects
Some projects by the studio: each card leads to the project page, with photos and description. The full list is on the Projects page.

AV Home — Dueville (Vicenza)
Contemporary villa of about 300 m² in Dueville (Vicenza), with an infinity pool, interiors and a private spa. See the project →

Villa MD Home — Verona
Villa in Verona, 280 m²: white volumes, a black wall, floor-to-ceiling glazing and a pool. See the project →

All studio projects
Villas, interiors and multi-residential projects by the studio: the full list is on the Projects page. See all projects →
Talk to the studio: architect Brenzone sul Garda
For information on a plot, a property or a villa project: write to the studio, the answer comes in writing.
or write to info@federicocappellina.com

Architect Brenzone sul Garda: villa market in Brenzone sul Garda: OMI data
The reference for residential values is the OMI database published by the Agenzia delle Entrate (the Italian revenue agency), which reports average transaction prices by property type and by micro-area. For the second semester of 2025, the figures for Brenzone sul Garda are as follows (recasa.re, OMI Brenzone sul Garda):
- Ville e villini: average 5,100 €/sqm, with a maximum for the area of 6,100 €/sqm.
- All residential property types combined: average 2,973 €/sqm.
- Transactions 2024 (NTN, numero di transazioni normalizzate — normalised transaction count): 80.9 residential transactions in total, of which 8.7 concerned properties above 145 sqm.
Two points of interpretation matter for a buyer. First, the gap between the villa figure and the all-types average reflects the weight of smaller and older units in the municipal stock; it is not a price forecast for any individual property. Second, the NTN is a normalised count, not a simple number of deeds, and the 8.7 figure for units above 145 sqm indicates that larger properties form a small share of local turnover.
Consequence for the project (studio assessment): the OMI bands are a starting reference for feasibility, not a valuation. A project budget should be built from a survey of the specific property, its condition and its position within the municipality, and compared against the OMI band for the relevant micro-area. Verification to be done: the OMI figures should be checked against the current Agenzia delle Entrate publication at the time of purchase, since the database is updated twice yearly.
Architect Brenzone sul Garda: the area of Brenzone sul Garda
Brenzone sul Garda is a comune in the province of Verona, Veneto, on the eastern shore of Lake Garda, and includes part of the Monte Baldo massif (it.wikipedia; Provincia di Verona). The municipal centre is reported at 65 m above sea level by the Provincia di Verona; this is the altitude of the centre, not the altimetric range of the whole municipal territory.
Population is reported as 2,456 at 31 December 2021 on the census figure attributed to ISTAT, while the Provincia di Verona reports 2,442 inhabitants at January 2025 (source given as «demo ISTAT»). A more recent directly verifiable ISTAT figure is not available in the sources consulted; the current population should be checked with the municipality. Among neighbouring comuni, the available sources indicate Malcesine and Torri del Benaco; a complete and verified list of bordering comuni is not available and must be checked with the municipality.
Road distances from Brenzone to provincial capitals or to the main airports cannot be stated here as verified figures: the available sources give approximate references, not documented road distances. These must be checked with the municipality or with a routing source before being used in any project document.
Two technical parameters are relevant to design and to construction cost. Seismic classification is zone 2, according to a secondary source attributing the data to the Protezione Civile (civil protection); this classification could not be verified here in a direct institutional source. Climate zone is D, with 2,099 degree-days, according to a secondary source citing DPR 412/1993; this too could not be verified here in a direct institutional source. Both parameters should be confirmed with the municipality and with the competent technical offices before structural or energy design is fixed.
On protected areas, the sources consulted do not allow identification of which protected areas or Natura 2000 sites fall within the municipal territory. This must be checked with the municipality and with the Veneto region before any application is prepared.
Architect Brenzone sul Garda: planning and landscape constraints in Brenzone sul Garda
(1) The planning instrument. Brenzone sul Garda has a PAT (Piano di Assetto del Territorio — the provincial-level structural plan for the municipality), approved by the Regione Veneto with D.G.R. n. 1584 of 10 November 2015 (regional ratification). The PRG (Piano Regolamentare Generale — the municipal operating plan) in force performs the function of the Piano degli Interventi (PI — the implementing plan) for the parts compatible with the PAT.
The first variant to the PI was adopted by the Consiglio comunale on 1 February 2019 (delibera comunale n. 1/2019). The sources consulted do not attest that this variant was subsequently approved, so whether it is now in force cannot be stated here and must be checked with the municipality.
The municipality publishes the norme di attuazione del PRG (implementing rules) and the regolamento edilizio/PRG (building regulation).
(2) Landscape constraints. A municipal document states that the entire municipal territory is subject to a landscape constraint under ministerial decrees of 27 January 1958 and 16 November 1973, referable to art. 136 of D.Lgs. 42/2004, categories «C» and «D» (municipal document). For the constraint categories under art. 142, the law includes, among others, coastal territories of lakes within 300 metres of the shoreline, mountain territories above the altitudes set by the norm, and woods (D.Lgs. 42/2004, art. 142).
No official municipal cartography was found in the available sources that would allow the precise extent of each constraint at Brenzone to be verified here. Precise perimeters for lake belts, woods and mountain territories cannot be stated and must be checked with the municipality and with the Soprintendenza.
Consequence for the project (studio assessment): a territory-wide landscape constraint means that the landscape authorisation procedure runs alongside the ordinary building permit for most interventions, and that the design of volumes, materials and external works will be assessed against that constraint. This affects programme and timing, not only aesthetics.
(3) Limits on new construction and local rules. The PRG implementing rules require that building work comply with the rules of the urban zone concerned and, among the prescriptions in the document, set a minimum net floor area of 45 sqm for new residential units and height limits for certain categories of new buildings. Their concrete applicability must be verified against the zone and against the updated provisions (norme di attuazione PRG).
Because the PRG document refers to a general variant approved in 1998 and the available sources do not clarify the status in force of all subsequent documents, a general current limit on new construction valid for the whole comune cannot be stated here. For a specific plot, the urban planning map and the rules applicable to the relevant zone must be consulted.
Architect Brenzone sul Garda: what this means for designing a villa in Brenzone sul Garda
The facts set out above have direct consequences for the design of a villa. The points below are the studio’s assessments; each is tied to a documented fact, and each identifies what still has to be verified.
- Landscape constraint across the whole municipality. A municipal document states that the entire territory is subject to landscape protection under the ministerial decrees of 27 January 1958 and 16 November 1973, under art. 136 of D.Lgs. 42/2004, categories “C” and “D” (municipal document). Studio assessment: the design process should assume that the landscape authority will examine the scheme, and that siting, volume, materials and the treatment of outdoor areas will be part of that examination. Verification: the exact perimeter and category of the constraint on the specific plot must be confirmed with the municipality and the competent landscape office.
- Coastal, mountain and woodland constraints under art. 142. The law includes lake coastal territories within 300 m of the shoreline, mountain territories above the thresholds set by the norm, and woodlands (D.Lgs. 42/2004, art. 142). Studio assessment: a plot near the shore or on the slopes above the centre may fall within one or more of these categories, which affects what can be built and how. Verification: the official municipal mapping of these perimeters is not available in the sources consulted; the extent of each constraint on the plot must be checked with the municipality.
- Planning instrument and its state of update. The municipality has a PAT approved by the Regione Veneto with D.G.R. n. 1584 of 10 November 2015 (regional ratification). The PRG acts as Piano degli Interventi for the parts compatible with the PAT; the first variant to the PI was adopted by the Consiglio comunale on 1 February 2019 (delibera comunale n. 1/2019), but the sources do not attest that it was subsequently approved. Studio assessment: the design must be tested against both the PRG as in force and the adopted variant, because the applicable rules may change. Verification: whether the variant is now in force must be confirmed with the municipality’s technical office.
- Local building rules. The PRG implementing norms set, among the prescriptions in the document, a minimum net floor area of 45 sqm for new dwellings and height limits for certain categories of new construction (norme di attuazione del PRG). Studio assessment: these are minimum parameters, not a design brief; the binding rules are those of the urbanistic zone in which the plot falls. Verification: the zone table and the updated norms for the specific lot must be read before any layout is fixed. A general limit valid for the whole municipality cannot be stated from the available sources.
- Seismic classification. Zone 2 is reported by a secondary source attributing the data to the Protezione Civile. Studio assessment: structural design will need to address seismic action, and this should be allowed for from the early stages. Verification: the classification must be confirmed in a direct institutional source.
- Climate zone. Zone D, 2,099 degree-days, is reported by a secondary source referring to DPR 412/1993. Studio assessment: this affects the calculation of heating and cooling demand and the specification of the building envelope. Verification: the figure must be confirmed in a direct institutional source.

Architect Brenzone sul Garda: checks before buying a plot in Brenzone sul Garda
The following checks are specific to this municipality and should be completed before a purchase commitment.
- Urbanistic zone of the plot. Obtain the zone table and the applicable norms from the PRG and the PI, and confirm the intended use and building parameters for that zone.
- Status of the 2019 PI variant. Ask the technical office whether the first variant to the Piano degli Interventi, adopted on 1 February 2019, has been approved and is in force.
- Landscape constraint. Confirm the application of the constraint under the decrees of 27 January 1958 and 16 November 1973 (art. 136, categories “C” and “D”) to the specific plot, and identify the authority competent for the authorisation.
- Art. 142 constraints. Verify whether the plot falls within 300 m of the shoreline, within mountain territories above the thresholds of the norm, or within woodland, using the official municipal mapping.
- Protected areas and Natura 2000. The sources consulted do not allow identification of which protected areas or Natura 2000 sites fall within the municipality; this must be checked with the municipality and the competent regional offices.
- Access and services. Confirm the legal and physical access to the plot and the availability of utilities; road distances from Brenzone to the main centres and airports cannot be stated from verifiable sources and must be checked directly.
- Seismic and climate parameters. Confirm the seismic classification and the climate zone in direct institutional sources before instructing structural and energy design.
- Market reference. Compare the asking price with the OMI band for ville e villini (average 5,100 €/sqm, maximum 6,100 €/sqm, second semester 2025) and with the all-types average of 2,973 €/sqm, checking the current OMI publication.

How the studio works
The studio follows a sequence of stages, adapted to the nature of each commission.
- Brief and feasibility. Establishing the client’s requirements, the constraints affecting the property and an initial assessment of what is permissible.
- Surveys and document review. Collecting the cadastral and urbanistic documentation, checking the planning position of the property and commissioning the technical surveys required.
- Concept design. Developing the layout and the relationship between the building and its setting, in the light of the constraints identified.
- Planning application. Preparing and lodging the application with the municipality and the competent authorities, and following the procedure through to its conclusion.
- Technical design and construction documents. Developing the scheme to the level required for tender and construction, with the structural and service consultants.
- Construction phase. Site supervision, coordination with the contractor and management of variations and site records.
Each stage is defined in a written appointment, and the checks listed above are carried out before commitments are made on the basis of a design assumption.
Do you need an architect Brenzone sul Garda for your plot?
Before buying, the studio reads the planning instrument, constraints and indices of the plot with you. Send the location, cadastral references or the listing.
or write to info@federicocappellina.com

Frequently asked questions
When should you involve an architect Brenzone sul Garda before buying a plot?
Before signing the preliminary contract. An architect Brenzone sul Garda reads the planning instrument, the constraints map and the technical rules that apply to the plot, and lists the checks to request from the municipality and the notary: this is the stage where a mistake costs least.
What does an architect Brenzone sul Garda do besides the design?
An architect Brenzone sul Garda follows the building and landscape permit, coordinates the consultants (structures, services, geologist) and supervises the works. The stages are described in the section «How the studio works».
How to choose an architect Brenzone sul Garda for a villa?
Look at completed projects, knowledge of local planning instruments and the ability to follow the site. The studio’s projects are on the Projects page.
How much does an architect Brenzone sul Garda cost for a villa?
An architect Brenzone sul Garda’s fee depends on the size of the work, the plot’s constraints and the stages requested (design, permit application, construction drawings, site supervision): it is set in a written quotation after the plot has been analysed.
What should you ask an architect Brenzone sul Garda to put in writing before the appointment?
The scope with the stages included, the fee for each, the estimated timing and the list of consultants involved. An architect Brenzone sul Garda should also state which checks remain with the client.
Can an architect Brenzone sul Garda handle the landscape permit too?
Yes: where the area is subject to a landscape constraint the architect prepares the documentation for the landscape authorisation together with the design; timing depends on the authorities concerned.
How long does an architect Brenzone sul Garda need to design a villa?
It depends on complexity and approval times: the design develops in stages and permit timing must be checked with the municipality before a schedule is fixed.
Can you involve an architect Brenzone sul Garda before buying the plot?
It is the prudent choice: the architect checks indices, constraints and access on the plot before the purchase, so conditions can be discussed with the seller while the decision is still open.
Do you need an architect Brenzone sul Garda for a renovation?
If the work needs a building permit or touches a landscape-protected area, an architect Brenzone sul Garda checks which procedure applies with the municipal technical office before any commitment.
What can an architect Brenzone sul Garda tell you before an offer on a plot?
An architect Brenzone sul Garda can read the planning instrument and the constraints map for the plot and list what must still be verified, so that the offer reflects what can actually be built.
Is the whole territory of Brenzone sul Garda subject to landscape constraint?
A municipal document states that the entire municipal territory is subject to landscape protection under the ministerial decrees of 27 January 1958 and 16 November 1973, under art. 136 of D.Lgs. 42/2004, categories “C” and “D” (municipal document). The precise perimeter and category for a specific plot must be confirmed with the municipality.
Which planning instrument applies to a plot in the municipality?
The municipality has a PAT approved with D.G.R. n. 1584 of 10 November 2015 (regional ratification). The PRG acts as Piano degli Interventi for the parts compatible with the PAT. The first variant to the PI was adopted on 1 February 2019 (delibera comunale n. 1/2019); whether it is now in force must be checked with the municipality.
Is there a minimum size for a new dwelling?
The PRG implementing norms set, among the prescriptions in the document, a minimum net floor area of 45 sqm for new dwellings (norme di attuazione del PRG). The rules actually binding on a plot are those of its urbanistic zone, and must be verified for the specific case.
Does the 300 m lake coastal constraint apply?
Art. 142 of D.Lgs. 42/2004 includes lake coastal territories within 300 m of the shoreline among the protected categories (D.Lgs. 42/2004, art. 142). The official municipal mapping needed to verify the extent of this constraint at Brenzone is not available in the sources consulted; the position of the plot must be checked with the municipality.
What are the reference prices for villas in Brenzone sul Garda?
For the second semester of 2025, OMI reports an average of 5,100 €/sqm for ville e villini, with a maximum of 6,100 €/sqm, and an all-types average of 2,973 €/sqm (recasa.re, OMI Brenzone sul Garda). These are reference bands, not valuations of an individual property.
How large is the local market?
NTN for 2024 records 80.9 residential transactions, of which 8.7 concerned properties above 145 sqm (recasa.re, OMI Brenzone sul Garda). The NTN is a normalised count, not a simple number of deeds.
What is the seismic classification and climate zone?
Zone 2 for seismicity and zone D with 2,099 degree-days are reported by secondary sources; the sources consulted do not allow direct verification in an institutional source, and both figures must be checked before design work begins.
For a specific property or plot, the studio can review the documentation and set out the checks required. Enquiries can be sent through the contact page; selected work is published in the projects section.
Architect Brenzone sul Garda: notes for those weighing an appointment
- An architect Brenzone sul Garda checks the planning designation of the plot before any volume is hypothesised.
- An architect Brenzone sul Garda asks the municipality for the certification of the constraints that affect the area.
- An architect Brenzone sul Garda compares the design with the building indices and the distances from boundaries and roads.
- An architect Brenzone sul Garda coordinates geologist, structural engineer and services engineers from the concept stage.
- An architect Brenzone sul Garda prepares the documents for the building permit and, where needed, for the landscape authorisation.
- An architect Brenzone sul Garda sets out timing and stages with the client, without promising dates that depend on the offices.
- An architect Brenzone sul Garda follows the site with periodic visits and minutes, until the works are closed.
- An architect Brenzone sul Garda hands the client the final documents for the occupancy certificate and the land registry.
Architect Brenzone sul Garda: ask the studio for information
For a villa project or a plot consultation: tell us the municipality, the area and your starting ideas. Direct contact with the architect, in writing.
or write to info@federicocappellina.com