Architect Garda: this page collects the public data available for owners and foreign buyers considering a villa project in Garda (VR): OMI villa values, the area, planning rules and landscape constraints, and the checks to make before buying a plot. Every figure is sourced; the studio’s assessments are labelled as such and where a figure is not available we say so. Federico Cappellina Architects is based in Verona.
Studio projects
Some projects by the studio: each card leads to the project page, with photos and description. The full list is on the Projects page.

Villa MD Home — Verona
Villa in Verona, 280 m²: white volumes, a black wall, floor-to-ceiling glazing and a pool. See the project →

AV Home — Dueville (Vicenza)
Contemporary villa of about 300 m² in Dueville (Vicenza), with an infinity pool, interiors and a private spa. See the project →

All studio projects
Villas, interiors and multi-residential projects by the studio: the full list is on the Projects page. See all projects →
Talk to the studio: architect Garda
For information on a plot, a property or a villa project: write to the studio, the answer comes in writing.
or write to info@federicocappellina.com

Architect Garda: villa market in Garda: OMI data
The reference for residential values is the OMI database published by the Agenzia delle Entrate (the Italian revenue agency), which records average asking and transaction values by property type and by zone within each municipality. The figures below refer to the second semester of 2025 and are taken from the Garda page of recasa.re.
- Ville e villini (detached and semi-detached houses with grounds): average 3,550 €/sqm, with a zone maximum of 4,200 €/sqm.
- All residential property types combined: average 2,858 €/sqm.
- Transaction volumes, 2024: 70.8 residential sales (NTN, the standardised number of transactions), of which 8 concerned properties above 145 sqm.
Two observations follow from these figures. First, the gap between the villa average and the all-types average is roughly 700 €/sqm, which indicates that the villa segment is priced distinctly above apartments and smaller units. Second, the volume of transactions above 145 sqm is small in absolute terms: eight sales in a year.
Studio assessment: a thin market at this size means fewer directly comparable sales for any given property, so a valuation or a purchase decision should rest on a careful reading of the specific building, its condition and its position rather than on the municipal average alone. Verification to be made: OMI values are zone-level averages; the applicable zone and the correct property category for a specific address must be checked against the OMI tables for Garda before any figure is used in a negotiation.
Architect Garda: the area of Garda
Garda is a municipality in the province of Verona, in Veneto, on the shore of Lake Garda. The municipalities it borders are Bardolino, Costermano sul Garda, Torri del Benaco, Manerba del Garda and San Felice del Benaco. The town centre is recorded at an altitude of 67 m above sea level; this figure appears on the municipal page but is not confirmed by an institutional source in the available results.
On accessibility, the road distance from Verona-Villafranca airport to Garda is 31.9 km. For road distances from Verona city and from other airports or regional capitals, no reliable figure referred to Garda town centre is available: these distances must be checked rather than estimated.
Two classifications are relevant at the early stage of a project. Garda is in seismic zone 2, and in climatic zone E with 2,252 degree-days. Both values appear in the available results, but no primary institutional source confirming each classification was found: both should be verified with the municipality or the competent regional offices before being used for structural or energy calculations.
On population, no verified ISTAT figure with a precise reference year could be established from the available results: the resident population must be checked against ISTAT or municipal records. On protected areas and Natura 2000 sites, the available results contain no reliable source identifying which sites, if any, fall within the municipal territory: this point must be checked with the municipality and the competent regional authority.
Studio assessment: the combination of lakeside position, a compact historic centre and a surrounding landscape of hills and morainic slopes means that site access, orientation and the relationship between a building and its grounds vary considerably from one property to another within the same municipality. For a project, this argues for an early site-specific reading rather than assumptions drawn from municipal averages.
Architect Garda: planning and landscape constraints in Garda
The municipal planning framework consists of the PAT (Piano di Assetto del Territorio, the provincial-level structural plan) and the PI (Piano degli Interventi, the operational plan that governs what may be built). The municipality states that the PAT was approved by Regional Council resolution no. 253 of 5 March 2013, and that the third PI was approved by Municipal Council resolution no. 12 of 5 June 2020.
These acts are published on the municipal pages for the PAT and for planning documents. The municipal page does not establish whether subsequent variants have been adopted: whether these are the updated and fully effective versions must be checked with the municipality’s technical office.
On landscape constraints, the municipality maintains a dedicated page on landscape and environmental protection, referring to areas protected by law under Article 142 of Legislative Decree 42/2004 (the Italian code on cultural heritage and landscape). The page consulted does not specify which categories under that article — the lakeshore belt, woodlands or mountainous territories — actually apply within the municipal territory, nor does it delimit the affected areas: this must be checked. Source: landscape constraint page.
Separately, the municipal site lists a collection of ministerial decrees and monumental and landscape constraints relating to the territory. The available results do not identify the individual provisions under Article 136 of the same decree, nor their perimeters: which municipal areas are affected must be checked. Source: constraints register.
On limits to new construction or special rules, the municipality publishes the Norme Tecniche Operative (the operative technical rules) of the third PI, but the available information does not contain a verifiable general rule describing municipal limits on new buildings. Which prescriptions apply to a specific area or property must be checked against the rules and maps of the PI for the parcel concerned. Source: urbanisation documents.
Studio assessment: for a foreign owner, the practical consequence is that no purchase or renovation decision should rest on general assumptions about what is permitted near the lake. The applicable rules depend on the parcel, its classification in the PI and any landscape constraint affecting it, and these must be established document by document before a project is defined.
Architect Garda: what this means for designing a villa in Garda
The facts above carry direct consequences for a project, and it is useful to state them as the studio’s assessment rather than as rules. Each assessment below is tied to a published fact and is followed by the verification that remains open.
- Planning framework. The municipality works through a PAT approved by Regional Council resolution no. 253 of 5 March 2013 and a third Piano degli Interventi (PI) approved by Municipal Council resolution no. 12 of 5 June 2020 (PAT page; planning documents). Studio assessment: the PI, not the PAT, is the instrument that governs what may be built on a specific plot, so the design brief should be tested against the PI’s Norme Tecniche Operative and maps for the parcel in question before any layout is drawn. Verification: the municipal pages do not establish whether later variants have been adopted; whether the 2020 PI is the fully current version must be checked with the municipality.
- Landscape constraints. The municipality maintains a page on landscape and environmental constraints, referring to areas protected by law under art. 142 of Legislative Decree 42/2004 (landscape constraint page). Studio assessment: where a constraint applies, the design process changes in kind — the constraint becomes a design parameter from the first sketch, not a later approval step, and the sequence of authorisations lengthens. Verification: the page does not specify which categories of art. 142 fall within the municipal territory or delimit them; this must be checked for the specific parcel.
- Monumental constraints. The municipal site lists ministerial decrees and monumental and landscape constraints relating to the territory (constraints register). Studio assessment: a property subject to an art. 136 constraint requires a different approval route and limits the scope of alteration. Verification: the available results do not identify the individual decrees or their perimeters; which areas are affected must be established with the municipality.
- Seismic classification. Garda is recorded in seismic zone 2, with climatic zone E and 2,252 degree-days. Studio assessment: zone 2 implies structural design developed with seismic criteria, which affects structural choices and cost from the outset. Verification: the available result does not provide a primary institutional source for these classifications, so they should be confirmed before they are relied on in a technical brief.
- Market depth. With eight sales above 145 sqm in 2024, the comparable set is thin. Studio assessment: design decisions should be documented carefully — drawings, permissions, technical specifications — because a future resale will rest on the quality of that documentation as much as on the municipal average.

Architect Garda: checks before buying a plot in Garda
The following checks are specific to this municipality and should be completed before a purchase commitment.
- Identify the parcel and its zoning. Obtain the cadastral reference and read the third PI’s Norme Tecniche Operative and maps for that parcel (urbanisation documents). The available information does not set out a general rule on limits to new construction, so the applicable prescriptions must be read for the specific area.
- Confirm the current planning version. Ask the municipality whether variants to the PAT or PI have been adopted since 2013 and 2020 respectively.
- Check landscape constraints. Establish whether the plot falls within areas protected under art. 142 of Legislative Decree 42/2004, using the municipal constraint page and a direct enquiry.
- Check art. 136 constraints. Verify against the municipal constraints register whether any ministerial decree affects the property or its surroundings.
- Confirm seismic and climatic classification. Obtain institutional confirmation of zone 2 and zone E, 2,252 degree-days, since the available source is not primary.
- Check protected areas. The available results contain no reliable source on which protected areas or Natura 2000 sites fall within the municipality; this must be verified with the competent bodies.
- Verify access and distances. The road distance from Verona-Villafranca airport is 31.9 km; distances from Verona city and other airports are not reliably established for Garda centre and should be measured for the specific address.
- Read the OMI zone. Confirm which OMI zone applies to the address and use the villa figure (average 3,550 €/sqm, zone maximum 4,200 €/sqm) only as a zone-level reference (OMI data).

How the studio works
The studio follows a staged process, set out here in general terms.
- Brief and feasibility. Establishing the client’s requirements and testing them against the planning framework and constraints applicable to the site.
- Due diligence with consultants. Coordinating the technical checks — planning, constraints, structure — with the relevant specialists before design develops.
- Concept and preliminary design. Developing the layout and its relationship to the site, in parallel with the authorisation route identified in the earlier stages.
- Permits and approvals. Preparing and following the application through the competent offices.
- Detailed design and construction documents. Producing the drawings and specifications needed for tender and construction.
- Construction phase. Site supervision and coordination with the contractor and consultants through to completion.
Each stage concludes with defined deliverables, so that the client can review and approve before the next begins.
Do you need an architect Garda for your plot?
Before buying, the studio reads the planning instrument, constraints and indices of the plot with you. Send the location, cadastral references or the listing.
or write to info@federicocappellina.com

Frequently asked questions
When should you involve an architect Garda before buying a plot?
Before signing the preliminary contract. An architect Garda reads the planning instrument, the constraints map and the technical rules that apply to the plot, and lists the checks to request from the municipality and the notary: this is the stage where a mistake costs least.
What does an architect Garda do besides the design?
An architect Garda follows the building and landscape permit, coordinates the consultants (structures, services, geologist) and supervises the works. The stages are described in the section «How the studio works».
How to choose an architect Garda for a villa?
Look at completed projects, knowledge of local planning instruments and the ability to follow the site. The studio’s projects are on the Projects page.
How much does an architect Garda cost for a villa?
An architect Garda’s fee depends on the size of the work, the plot’s constraints and the stages requested (design, permit application, construction drawings, site supervision): it is set in a written quotation after the plot has been analysed.
What should you ask an architect Garda to put in writing before the appointment?
The scope with the stages included, the fee for each, the estimated timing and the list of consultants involved. An architect Garda should also state which checks remain with the client.
Can an architect Garda handle the landscape permit too?
Yes: where the area is subject to a landscape constraint the architect prepares the documentation for the landscape authorisation together with the design; timing depends on the authorities concerned.
How long does an architect Garda need to design a villa?
It depends on complexity and approval times: the design develops in stages and permit timing must be checked with the municipality before a schedule is fixed.
Can you involve an architect Garda before buying the plot?
It is the prudent choice: the architect checks indices, constraints and access on the plot before the purchase, so conditions can be discussed with the seller while the decision is still open.
Do you need an architect Garda for a renovation?
If the work needs a building permit or touches a landscape-protected area, an architect Garda checks which procedure applies with the municipal technical office before any commitment.
What can an architect Garda tell you before an offer on a plot?
An architect Garda can read the planning instrument and the constraints map for the plot and list what must still be verified, so that the offer reflects what can actually be built.
What are typical villa values in Garda?
The OMI figure for ville e villini is an average of 3,550 €/sqm, with a zone maximum of 4,200 €/sqm, against an all-types average of 2,858 €/sqm (second semester 2025, recasa.re). These are zone-level averages and must be checked for the specific address.
How many large properties change hands each year?
In 2024 there were 70.8 residential transactions in total, of which 8 concerned properties above 145 sqm. The comparable set for a large villa is therefore small.
Which planning instrument governs a plot in Garda?
The Piano degli Interventi, the third version of which was approved by Municipal Council resolution no. 12 of 5 June 2020. Whether later variants exist must be checked with the municipality.
Is the territory subject to landscape constraints?
The municipality maintains a page on constraints under art. 142 of Legislative Decree 42/2004, but it does not specify which categories apply or where. This must be verified for the parcel.
What seismic zone is Garda in?
The available result records zone 2, climatic zone E with 2,252 degree-days, but without a primary institutional source; the classification should be confirmed.
How far is the airport?
The road distance from Verona-Villafranca airport to Garda is 31.9 km. Distances from Verona city and other airports are not reliably established for the town centre.
Can the studio confirm whether a specific plot is buildable?
Not from published data alone. Buildability depends on the PI provisions and constraints for that parcel, which must be checked with the municipality.
For a specific property or plot, the studio can review the available documentation and set out which checks remain open. You can contact the studio to discuss a project, and see the studio’s projects for its approach to design.
Architect Garda: glossary of the terms used on this page
OMI
Osservatorio del Mercato Immobiliare: the real-estate market observatory operated by the Italian revenue agency. It publishes periodic average asking and transaction values, organised by municipality, by homogeneous zone and by property category. OMI figures are zone-level averages and are indicative only; the applicable zone and category for a specific address must be verified against the official tables before use.
NTN
Numero di Transazioni Normalizzate: a standardised measure of the number of real-estate transactions recorded in a given period and area. Each sale is weighted according to the share of the property transferred, so that partial transfers count proportionally. NTN is used to gauge market volume and liquidity and is distinct from a simple count of deeds.
Planning instrument
A municipal or supra-municipal act that governs land use and building activity within a territory. In Italy the planning framework is layered, typically combining a structural plan setting long-term strategy with an operational plan that regulates what may be built and where. Planning instruments are adopted and approved through formal procedures and are subject to subsequent variants.
Landscape constraint
A legal restriction on land or buildings imposed to protect landscape, environmental or cultural values. It may derive directly from general statutory provisions applying to defined categories of land, or from a specific administrative measure. Where a constraint applies, works are subject to authorisation by the competent authority and to specific conditions of protection.
Seismic zone
A classification of Italian territory according to the level of seismic hazard, used to determine the structural design requirements applicable to buildings. Zones are numbered in ascending order of hazard. The classification of a site affects design, verification and, in some cases, the admissibility of works, and should be confirmed with the competent authorities.
Climate zone
A classification of Italian municipalities according to heating demand, expressed in degree-days, used to regulate the use of heating systems and to set energy requirements for buildings. Zones are lettered from the mildest to the coldest. The classification of a site is relevant to energy calculations and plant design and should be verified with the competent offices.
Building permit
The administrative authorisation required in Italy for certain categories of construction or transformation works, as distinct from simpler notifications or permitted-activity regimes. It is issued by the municipality after verification of compliance with planning instruments, technical rules and applicable constraints. The category of works determines which procedure applies.
Floor-area index
A planning parameter expressing the maximum buildable floor area permitted on a given plot, usually as a ratio between built surface and land area. It is defined by the applicable planning instrument and technical rules and may be combined with other limits such as height, coverage or distance requirements. The applicable index must be verified for each specific site.
Natura 2000
A European network of protected sites established to conserve habitats and species of community interest, comprising special protection areas and sites of community importance. Sites within the network are subject to specific assessment and authorisation requirements for plans and projects likely to affect them. Whether a given property falls within or near such a site must be verified.
Anyone consulting an architect Garda should ask that each glossary entry be tied to the municipality’s official documents rather than to general estimates.
For an architect Garda these terms are the working language: every check on the plot starts here.
An architect Garda explains the meaning of each term to the client before the design is set up.
The definitions are a guide: the detailed check belongs to the technical office and the appointed architect Garda.
Architect Garda: notes for those weighing an appointment
- An architect Garda checks the planning designation of the plot before any volume is hypothesised.
- An architect Garda asks the municipality for the certification of the constraints that affect the area.
- An architect Garda compares the design with the building indices and the distances from boundaries and roads.
Architect Garda: ask the studio for information
For a villa project or a plot consultation: tell us the municipality, the area and your starting ideas. Direct contact with the architect, in writing.
or write to info@federicocappellina.com